Antelope Subbasin Monitoring Network and Data Gaps - Planned Construction Activities
Task 3.
Conduct planning, design activities, and provide maps associated with the three (3) multi-completion wells potential locations, five (5) shallow monitoring wells (shallow < 50 ft), fifteen (15) stream gages, and domestic well monitoring network. Perform a technical assessment of the number and location of groundwater monitoring sites, stream gages, and domestic wells. Acquire necessary permits required for the installation of the monitoring sites or modification of existing surface water gages, biological study, and synoptic stream gauging
Corning Subbasin Monitoring Network and Data Gaps - Planned Construction Activities
Task 3.
Component 3 consists of the installation of monitoring wells, surface water stream gages, a biological survey, conducting geophysical surveys, performing aquifer tests, a domestic well program, and domestic well outreach. Implementing the following tasks will expand the understanding of Subbasin hydrogeologic and hydrologic conditions. Task 1: Data Gaps, Monitoring, and Domestic Well Monitoring Planning, Task 2: Data Gaps, Task 3: Groundwater Level and Quality Monitoring, Task 4: Domestic Well Program, Task 5: Stream Gaging, Task 6: Biological Survey, Task 7: Expand Groundwater Quality Network, Task 8: Understand Subbasin Subsurface, and 9: Domestic Well Outreach