title
PUBLIC WORKS - Interim Director Will Pike
end
Requested Action(s)
recommendation
a) CHANGE ORDER - Request authorization for the Interim Director to issue Change Order No. 13 Supplement No. 1, to Agreement with JF Shea Inc. (Road Agreement #2022-23) for the Evergreen Road Bridge Replacement Project, for the extended rental and removal cost of the sheet piling used to divert groundwater, in an amount equal to $154,010.04
b) CHANGE ORDER - Request authorization for the Interim Director to issue Change Order No. 23, to the Agreement with JF Shea Inc. (Road Agreement #2022-23) for the Evergreen Road Bridge Replacement Project, to modify inlet elevations at Drainage System 1 locations (e) and (g), in an amount equal to $7,170
c) CHANGE ORDER - Request authorization for the Interim Director to issue Change Order No. 26, to the Agreement with JF Shea Inc. (Road Agreement #2022-23) for the Evergreen Road Bridge Replacement Project, to realign Ditch "D2", in an amount equal to $23,008.86
d) CHANGE ORDER - Request authorization for the Interim Director to issue Change Order No. 29, to the Agreement with JF Shea Inc. (Road Agreement #2022-23) for the Evergreen Road Bridge Replacement Project, to change the Type 85 bridge rail barrier post spacing from 10'-0" to 6'-7", in an amount equal to $27,317.85
e) CHANGE ORDER - Request authorization for the Interim Director to issue Change Order No. 30, to the Agreement with JF Shea Inc. (Road Agreement #2022-23) for the Evergreen Road Bridge Replacement Project, to install drainage culverts at Driveway 3, Driveway 4, and modify Ditch "D14", in an amount equal to $22,092.09
f) CHANGE ORDER - Request authorization for the Interim Director to issue Change Order No. 31, to the Agreement with JF Shea Inc. (Road Agreement #2022-23) for the Evergreen Road Bridge Replacement Project, to install corrugated steel pipe (CSP) down drains in lieu of hot mix asphalt (HMA) overside drains, in an amount equal to $2,821.33
g) CHANGE ...